The white water course of Nottingham (UK)
« Renovation and upgrading of an existing white water course »

:: White water stadium > gravity system > Nottingham

The Nottingham white water course has been built more than 20 years ago. The BCU wishes to optimize the course by a better distribution of the difference in level and the installation of mobile obstacles. The first part of the river has been modified in the beginning of 2007, which gives an idea of the feasible improvements for the rest of the white water course.


Characteristics of the Nottingham white water course
Water supply By gravity
Flow rate 5 to 28 m³/s
Length 320 m
Width 6 to 18 m
Drop 3 m
Difficulty Level II à III
  • Client: British Canoe Union

  • Work done by Hydrostadium : Pre-project and project studies

  • Date de mise en service: en cours de projet

Introduzione | scriveteci | menzione legali | alto