Ivréa

At the request of the Ivrea Canoe and Kayak Club, Hydrostadium accepted an expertise mission in the beginning of 2007. The aim of this expertise was the optimization of the last third of the course with a view to the organization of the World Cup Sprinting in June 2007. The re-modeling of the end of the course makes it much more attractive. Moreover, the water level is higher and the final threshold with drop safer.

 

Ivréa
Ivréa

 

Ivréa
Ivréa
 

Characteristics of the Ivrea white water stadium

Water supply By gravity
Flow rate 6 to 20 m³/s
Length 220 m
Width 7 to 14 m
Drop 7 m
Difficulty II to IV
  • Client: Ivrea Canoa Club
  • Work done by Hydrostadium: Summery pre-project and Execution studies
  • Opening date: April 2007