Creation of a 2.3 MW small hydropower plant for the Agout River (58 m3/s)
Plant with two 2.4 MW Kaplan units; 12.5 m-high mobile weir (class C), divided into two bays equipped with 20 x 4 m flap gates; fish-friendly intake (rack plane inclined at 26°, spacing: 2 cm); 2 m3/s downstream migration facility; 1 m3/s general upstream migration facility; eel pass (stud-type substrate).
Work phasing (hydrology); restricted space; earthworks and retaining structures; sheet-pile/embankment cofferdams.