Downstream fish passage at the Pebernat power plant (09)

Project owner EDF UP Sud-Ouest

Type of project Fish passage compliance, downstream migration

Main technical features

20 mm-spacing fine screen layout, 62 m long, 8-tonne mobile trash rake – automatic raking of the 62 m in 45 minutes, downstream fish passage through the installation of an overflow flap on the existing sector gate (flow rate of 2 m3/s, i.e. 4 % of the 50 m3/s design flow) + receiving basin with Omniflots obstacles®.

Specific constraints

Multi-package project involving 14 companies, embankment cofferdam construction in the reservoir.

  • Location Pebernat 09100 Bonnac
  • Project / construction cost 1,35 M €
  • Years of completion 2015-2017