Menu
Menu
Creation of a 200 m bypass river divided into 20 pools, each 6 m long (average slope of 2.7 %), with a gross head of 5.70 m.
Earthworks for the pools by cut-and-fill operations; geomembrane system for watertightness; covering of the bottoms with blocks and seeding of the banks.
Difficult access; flood-prone area; landscape integration.
Learn more...
Contact us
Access the details of a project by selecting a point on the map.
Sort projects