Saint Pierre en Faucigny Power Plant (74)

Project owner EDF Unité de production Alpes

Type of project Comprehensive renovation of the Saint Pierre en Faucigny power plant (74)

HYDROSTADIUM provided project management services for the comprehensive renovation of the scheme, including detailed design studies for the penstock, contractor procurement and construction supervision, with the technical coordination of all work packages.

Main technical features

Penstock: 270 linear metres and 1.5 m in diameter.

Specific constraints

Asbestos removal work was carried out under Subsection 3, with containment of the areas concerned (the plant basement and the penstock manifold). Excavation on steep slopes (spider excavator).

  • Location 74800 Saint-Pierre-en-Faucigny
  • Project / construction cost 5,6 M €
  • Years of completion 2016-2018