Menu
Menu
HYDROSTADIUM provided project management services for the comprehensive renovation of the scheme, including detailed design studies for the penstock, contractor procurement and construction supervision, with the technical coordination of all work packages.
Penstock: 270 linear metres and 1.5 m in diameter.
Asbestos removal work was carried out under Subsection 3, with containment of the areas concerned (the plant basement and the penstock manifold). Excavation on steep slopes (spider excavator).
Learn more...
Contact us
Access the details of a project by selecting a point on the map.
Sort projects